Offshore desalination plant

The Marine Water Plant (MWP) concept has the advantage of rapid deployment on site, as it frees the project owner from all issues related to land and building construction.
The study will determine the reduction in capital expenditure.
In addition, the MWP is mobile and can be deployed at several sites.
Placed halfway between land and the pumping area, this process optimizes pipeline management.
The personnel live on board, which optimizes their efficiency.
The ship’s cranes make the project self-sufficient in terms of handling.
Bunkering is traditional by barge from the port.

Completion timeframe:
* Design and development: 18 months
* Construction: 26 months
Production capacity: 200,000 m3/day of drinking water.